Two kinds of installation of intensive bus duct

1. intensive busway vertical installation.

1. Accurate measurement According to the position of the embedded hole of the wooden floor, connect two galvanized angle steel support frames and dense bus grooves with bolts, then cover the anti-seismic torsion spring and sealing ring with the bolts brought by the distributor, tighten the nut, and then fix it on the bad steel support frame. The total number of torsion spring support point groups shall be specified according to the type and volume of the dense bus duct.

2. Use horizontal pressure plates, bolts, nuts, flat washers and self-locking nuts to fix the dense bus duct on the-galvanized angle steel support frame. Then install by section to ensure that the dense bus duct is vertical (use magnetic wire to beat the vertical line). Cover the terminals with the rear cover and fix them with bolts.

Horizontal installation of 2. intensive busway.

1. During horizontal installation, use horizontal tooling fixtures, bolts, nuts, flat washers and self-locking nuts to fix the dense bus duct (horizontal) on the support frame of the galvanized angle steel bracket.

2. Install on the horizontal side. Intensive busway (placed on the side) is fixed on the galvanized angle steel support frame according to the fixture, bolt, nut, flat washer and self-locking nut installed on the side. When installing the dense bus duct horizontally, please ensure the level of the dense bus duct, lift the terminal cover on the terminal block, and fix it with bolts.

The above 2 points are all the contents of the 2 key points in the intensive bus duct installation. Thank you for mastering and applying!